FMCG

Short shelf lives, monthly promotions and new products each season make fast, accurate planning essential in FMCG.

Case 1 · Major global FMCG brandDemand forecasting

Challenge

Automate sell-in, sell-out, baseline and market volume forecasts for 1,200 SKUs across five nationwide chains. JDA Demand Planning was the benchmark.

Solution

The forecasting system accounts for the planning calendar, product launches, the transfer of sales history between products, promotions, inventory and differences in demand by chain. The partner set up a center of expertise.

Result
  • Forecast accuracy: Up 12 percentage points over JDA
  • Calculation time: Cut from 1.5 weeks to one hour
  • Automation: All forecast types are calculated automatically

Case 2 · Top-three Russian meat processing groupReplacing SAP IBP

Challenge

Replace SAP IBP with a Russian demand planning solution for chicken, turkey, pork and processed meat.

Solution

The planning system combined statistical forecasting, forecasts for temporary activities and DFM. It accounts for seasonality, promotions, scenarios, the transfer of demand volumes between products and FRESH/RTE categories. The team automated ETL from multiple systems, configured multilevel volume allocation rules and implemented hybrid forecasting models.

Result
  • SAP replacement: Full replacement with existing functionality retained
  • Accuracy: 75–90% across key categories
  • Service levels: Stockouts fell by eight percentage points
  • Processes: End-to-end support for S&OP and S&OE cycles

Case 3 · Leading home goods manufacturerIBP system

Challenge

Build an IBP system for assortment management, demand forecasting, sales planning and promotions across around 8,000 SKUs and 1,200 retail banners and chains.

Solution

The model accounts for underlying, event-driven and regional seasonality, substitutes, private-label production, product launches and differing behavior across nationwide chains, marketplaces and smaller wholesalers. Key account managers have a dedicated workspace for adjustments, and sales and trade marketing share a promotion approval workspace.

Result
  • Forecast accuracy: Up 22 percentage points
  • Speed: The forecast takes under an hour to calculate
  • End-to-end process: One planning cycle from the assortment matrix to the approved sales plan
  • Management: S&OP/S&OE, financial reporting and P&L were implemented

Case 4 · Market leader in pet supplies and foodForecasting and planning

Challenge

Replace an overseas solution with a unified demand forecasting and sales planning environment for around 2,000 SKUs, 50 retail banners and 20 channels.

Solution

The forecast accounts for the planning calendar and demand for unpackaged finished products. Historical anomalies are removed automatically, with adjustments available to business users. The system also accounts for shortages and unfulfilled orders and provides planner alerts.

Result
  • Accuracy: Up 11 percentage points over the previous solution
  • Replacement: The overseas system was fully replaced
  • Speed: Forecasts are calculated in a matter of hours
  • Usability: Individual planner workspaces were configured

Case 5 · Leading premium cosmetics retailerRetail sales forecasting

Challenge

Build ETL pipelines, retail sales forecasting and reporting for 100,000 SKUs, 100+ stores and partner retail channels. Around 20% of the range consists of new products.

Solution

The model accounts for seasonal profiles, product lifecycle, promotions and trade marketing, cannibalization within product groups, and color attributes such as hue, saturation and lightness.

Result
  • Accuracy: Up 18 percentage points, reaching 80–95% by category
  • Planning time: Cut from two weeks to two hours
  • Operations: Orders were processed 3.5 times faster
  • Financial impact: Sales rose 15% with 99% in-stock availability
  • Working capital: Capital tied up in stock fell by 12%

Case 6 · Market-leading dairy groupProduction planning

Challenge

Develop and pilot a planning system as part of the client's tender, including a full MRP cycle, an optimization model and workspaces for 100+ planners. Constraints included shelf lives of 5–15 days, around 70% remaining shelf life, a cold chain at 4 ± 2°C, holding periods of up to 21 days, milk within 36 hours of milking with variable volume and quality, and 100+ lines across 12 plants.

Solution

The optimization model schedules production from milk blending through packaging and accounts for line capacity, changeovers and holding periods. MRP breaks the plan down by recipe to calculate net raw material and packaging requirements. A shared planner workspace supports manual adjustments and what-if scenarios.

Result
  • Status: The pilot succeeded on real data
  • Flexibility: The plan can be recalculated within minutes when milk supply or demand changes
  • Balance: The system balances minimizing write-offs with service levels automatically
  • Efficiency: Planners stopped reconciling spreadsheets manually